The platform
25 modules. One connected way to run the plant.
- 01
Find and fix
The loop itself — a problem seen, understood, closed and banked.
4 modules- AuditsWalk a zone with your phone. AI categorizes each defect across 7 TPM types in 1.2s. Score breakdown shows your path to 5/5.
- DefectsA simple three-column board: open → planned → completed. Every defect has an owner, due date, and after-photo proof of closure.
- Root CauseSix-step structured A3 problem-solving with multi-thread 5-Whys, 6M Fishbone, and AI Diagnose. The whole A3 prints to a single A4.
- ImprovementsTrack kaizen ideas through approval → implementation → verification with a finance-grade savings ledger your CFO will trust.
- 02
Run the plant
The daily work the loop happens inside.
5 modules- Daily ManagementTier 1 to 3 SQDCM boards, a meeting that runs itself with attendance and a recap, and a red cell three days running that escalates to the tier above.
- MaintenanceWork orders, the asset register, PM schedules against a crew's real capacity, spares, purchase orders and the reliability tables — seven tabs over one plant clock.
- ChecklistsVersioned digital checklists with out-of-tolerance auto-defects, clock-anchored due slots and a calibrated-instrument gate. Out of paper, into Postgres.
- WarehouseStock by location, movements and counts, so the part a work order needs is either on the shelf or on order.
- My TasksEvery action assigned to you across modules — defects to fix, improvements to verify, A3 steps to drive — in one prioritized list.
- 03
Prove it
What an auditor, a customer or a regulator asks to see.
4 modules- QualityNon-conformance reports and CAPAs with the cost of poor quality split scrap from rework, and a transition map so a status a server refuses is never offered.
- InstrumentsThe compliance layer your auditor reads first: SHA-256 hash-chained audit log, calibration register with cal-cert validity gates, dual-signature verification queue, shift / batch cohort lock. IATF · ISO · GMP · HACCP · AS9100, defensible from day one.
- SafetyIncidents, corrective actions and safe / unsafe observations, with days since a lost-time accident counted from the record rather than a wall chart.
- ReportsTwenty-one exports — audits, findings, kaizens, work orders, skills, incidents — each gated by the module a person can already open.
- 04
Teach it
How a fix becomes the way the job is done.
4 modules- OPLs and SOPsA one-point lesson drafted from the fix that caused it, an SOP written in three steps and signed off by everyone it needs, and the skill matrix both of them sharpen.
- TrainingWho is certified on what, what expires when, and the sessions that close the gap.
- GlossaryEvery lean term the app uses, in plain words, in the operator's own language.
- Plant LogA searchable history of what this plant has already tried, so the same fix is not invented twice.
- 05
See it
What the plant knows about itself.
8 modules- HomeThe plant's morning read: what moved, what is late, and the one thing worth walking to first.
- Factory IntelligenceAsk the plant a question in your own words. The answer cites the records it was read from, and the evidence drawer opens every one of them.
- InsightsTrends across zones and months, with the sample beside every average and a null where nothing can be computed.
- FeedBefore/after photo cards of every closed defect and verified improvement. Built for shift-end celebration and weekly stand-ups.
- LeaderboardPoints-based ranking with podium, rising stars, and recent wins. The discipline lever that drives weekly cadence.
- AI CoachA standing conversation about this plant, grounded on the same records every other screen reads.
- TeamWho owns which zone, who reports to whom, and where a zone has no owner at all.
- SettingsMulti-site hierarchy, RBAC, audit standards, integrations — everything an enterprise IT team will ask about during procurement.
The real app
A day on LeanOS.
Real screens from the sample plant your trial starts with. Swipe across →

07:10Walk the zone
The shift lead opens the zone, sees last week's 5S score and the defect still open, and starts the walk.

09:30Stand-up at the board
Safety, quality, delivery and cost in red, amber and green. Ten minutes, no printouts.

14:05A machine stops
Reported in one tap. The downtime counts from that moment, and the technician sees it at once.

FridayWhat it saved
A verified improvement, worth ₹48K a month, on the savings ledger.
Your workspace arrives filled in for your industry.
The loop is waiting
Stop running lean across disconnected places.
Your first audit takes five minutes. Start with one plant and see what changes.